BizJet Brief
Wednesday, November 25, 2026
BizJet Brief

Wednesday, November 25, 2026

Education

Deicing and Holdover Times: What Business Jet Crews Need to Know for Winter 2026-2027

How the FAA's 2026-2027 holdover time guidelines work for business jet crews: clean-aircraft rules, Type I vs. Type IV fluids and no-HOT conditions.

Deicing and Holdover Times: What Business Jet Crews Need to Know for Winter 2026-2027
File photo: Aero Icarus / Wikimedia Commons (Flickr), CC BY-SA 2.0. Business jets, including Challenger 604 OH-MOL, on a snow-covered ramp at Zurich Airport, Jan. 30, 2010

Winter flying in a business jet starts on the ramp. Before the wheels roll, crews have to be sure the wings, tail and control surfaces are clean, and that the fluid sprayed on them will keep them clean until takeoff.

The FAA published its official Holdover Time Guidelines for Winter 2026-2027 on Aug. 11, together with a General Information Document that explains how to use them. With the first snow events of the season arriving and Thanksgiving travel ahead, here is a plain-language refresher on what the rules say and how the tables work.

The rule: no contamination at takeoff

The legal starting point is the "clean aircraft" concept. Under 14 CFR 91.527, which covers large and turbine-powered multiengine airplanes under Part 91, no pilot may take off with frost, ice or snow adhering to a propeller, windshield, wing, stabilizing or control surface, powerplant installation, or key flight instruments. The only exception is frost under the wing in the fuel tank area, and only if the FAA has authorized it.

Charter crews have an extra layer. 14 CFR 135.227 says that when frost, ice or snow "may reasonably be expected to adhere to the airplane," a pilot may not take off unless trained under Section 135.341 and unless one of three things is in place:

  • A pretakeoff contamination check, approved for that airplane type, completed within 5 minutes before beginning the takeoff.
  • An FAA-approved alternative procedure that confirms the airplane is clean.
  • An approved deicing/anti-icing program that meets 14 CFR 121.629(c), with the takeoff flown under that program.

What holdover time means

Section 121.629 defines holdover time as "the estimated time deicing/anti-icing fluid will prevent the formation of frost or ice and the accumulation of snow on the protected surfaces of an aircraft." The clock starts when the final application of fluid begins, not when the truck pulls away, and it runs out when the fluid loses its effectiveness.

That detail matters at a busy FBO. If the final anti-icing step started at 0712, the holdover time is counted from 0712, even if the crew is still finishing checklists at 0720.

The FAA is clear that the tables are a planning tool, not a guarantee. The cautions in the 2026-2027 guidelines state that "the responsibility for the application of these data remains with the user," that ground fluids "do not provide in-flight icing protection," and that the tables are "for departure planning only and should be used in conjunction with pre-takeoff check procedures." The same document notes that holdover time may be reduced when the aircraft's skin is colder than the outside air, which is common after a cold-soaked night or a long, high-altitude leg.

Type I versus Type IV

The FAA's General Information Document describes the fluid families this way:

  • Type I is a thin, glycol-based fluid, usually dyed orange, used mainly for deicing. It is applied heated, with HOTs based on a minimum nozzle temperature of 60 °C (140 °F), and it dilutes quickly in precipitation. The FAA calls it a practical anti-icing choice only for light precipitation, short taxi routes and light traffic.
  • Types II, III and IV are thickened fluids that form a protective coating and absorb freezing or frozen contamination, except ice pellets and small hail. They thin out under the airflow of the takeoff roll and shear off the wing. Type IV is the usual long-holdover anti-icing fluid at U.S. airports. The FAA notes that the only Type III fluid is ethylene glycol based and is not common in the U.S.

Rotation speed matters. The FAA says several manufacturers have published special takeoff procedures so certain airplane models that rotate below 100 knots can safely use Type II and IV fluids. Crews of light jets should check their AFM and OEM guidance before accepting a thickened fluid.

Reading the table, and the ranges

Each cell in a HOT table shows a range. The FAA's own example: for Type I fluid on aluminum surfaces, between -3 °C and -6 °C in freezing drizzle, the table reads 0:05 to 0:09. That means protection could last as little as 5 minutes in moderate or heavy freezing drizzle, or as long as 9 minutes in light freezing drizzle. The lower number applies to heavier precipitation.

Type I tables also come in two versions, one for critical surfaces made mostly of aluminum and one for composite surfaces. HOTs for composites are shorter, which matters for newer business jets with composite structures.

Conditions with no holdover time

Some weather has no holdover time at all. The FAA's guidance says there are no HOTs for heavy snow, ice pellets or hail. For heavy snow, operators with an approved program may be allowed to take off with proper tactile or visual checks, including a tactile check of the critical surfaces within 5 minutes of takeoff where the program calls for it. For light and moderate ice pellets, the FAA publishes separate "allowance times" with their own limits.

This season's guidelines also reassign the METAR codes FZDZPL and DZPL from the light ice pellets category to "Moderate Ice Pellets mixed with Drizzle or Freezing Drizzle," and remove the codes +FZDZPL and +DZPL. Crews who keep a printed copy from last winter should replace it.

Before the next cold morning

Practical habits for flight crews and cabin crews alike:

  • Download the current FAA tables from the FAA Aircraft Ground Deicing page and follow your operator's program.
  • Ask the deice crew for the fluid type, brand, mixture and the start time of the final step, and write them down.
  • Watch for anything that shortens holdover: heavier precipitation, jet blast, a cold-soaked airframe, or a long taxi queue.
  • When in doubt, get a fresh check or return for another treatment. The FAA's standard remains a clean aircraft at the start of the takeoff roll.

Flight attendants can help, too. Passengers sometimes notice the spray and the smell of glycol and ask questions. A short, calm explanation that the crew is removing ice and protecting the wings for takeoff goes a long way.

Sources

  1. FAA: Holdover Time Guidelines, Winter 2026-2027 (Original Issue, Aug. 11, 2026)
  2. FAA: Ground Deicing Program General Information Document, Winter 2026-2027
  3. FAA: Aircraft Ground Deicing
  4. eCFR: 14 CFR 91.527, Operating in icing conditions
  5. eCFR: 14 CFR 135.227, Icing conditions: Operating limitations
  6. eCFR: 14 CFR 121.629, Operation in icing conditions