BizJet Brief
Wednesday, November 25, 2026
BizJet Brief

Wednesday, November 25, 2026

Education

Holiday Rush Duty Days: How Part 135 and Part 91K Flight, Duty and Rest Rules Work for Business Jet Crews

A plain-language guide to Part 135 and Part 91K flight time, duty and rest limits for charter and fractional crews during the Thanksgiving rush.

Holiday Rush Duty Days: How Part 135 and Part 91K Flight, Duty and Rest Rules Work for Business Jet Crews
File photo: Quintin Soloviev / Wikimedia Commons, CC BY-SA 4.0. NetJets Cessna Citation Latitude N665QS at Westhampton Beach, N.Y., December 2019

Thanksgiving week is one of the busiest stretches of the year for business aviation. Owners head to family, charter phones ring late, and schedulers try to squeeze one more leg into the day. That is exactly when crews need to know where the legal limits sit, and who is responsible for staying inside them.

This refresher walks through the flight time, duty and rest rules that apply to on-demand charter crews under Part 135 and fractional crews under Part 91 Subpart K (Part 91K). It is built from the regulation text itself in the Electronic Code of Federal Regulations. Your operator's manual may be stricter, and when it is, the stricter rule wins for you.

Who these rules cover

The sections below apply to certificate holders under Part 135 and to fractional program managers under Part 91K. A Part 91 corporate flight department flying its own airplane is not covered by these sections; those departments typically set their own duty and rest limits in their operations manuals.

One point both rules share: the burden is on both sides. Section 135.267 says no certificate holder may assign a flight crewmember, "and no flight crewmember may accept an assignment," that breaks the limits. The 91K rule, Section 91.1059, uses the same wording for program managers. Saying yes to an illegal trip is a violation for the pilot, too.

The big-picture caps

Under both 135.267(a) and 91.1059(a), a pilot on a one- or two-pilot crew may not exceed, in all commercial flying combined:

  • 500 hours in any calendar quarter
  • 800 hours in any two consecutive calendar quarters
  • 1,400 hours in any calendar year

Note the phrase "all commercial flying." Hours flown for another operator count against the same totals, which matters for contract pilots who fly for more than one company.

Part 135: the daily limits

Section 135.267(b) limits total flight time in any 24 consecutive hours to 8 hours for a single-pilot crew and 10 hours for a two-pilot crew, again counting other commercial flying.

Every assignment must also provide "at least 10 consecutive hours of rest during the 24-hour period that precedes the planned completion time of the assignment," under 135.267(d). This is the classic look-back test: pick the moment the last leg is planned to end, look back 24 hours, and find 10 straight hours of rest in that window.

Section 135.267(c) offers a second path. Flight time may go beyond the paragraph (b) limits only inside a regularly assigned duty period of no more than 14 hours that is preceded and followed by at least 10 consecutive hours of rest, where duty and rest together equal 24 hours. Even then, flight time stays capped at 8 hours for one pilot and 10 hours for two.

When weather pushes you over

Holiday weather can stretch a planned day. Section 135.267(e) covers a crew that exceeds the daily limits "because of circumstances beyond the control of the certificate holder or flight crewmember (such as adverse weather conditions)." The crew then needs a longer rest before the next assignment:

  • 11 consecutive hours if the limit was exceeded by no more than 30 minutes
  • 12 consecutive hours if it was exceeded by 30 to 60 minutes
  • 16 consecutive hours if it was exceeded by more than 60 minutes

The rule is about circumstances beyond anyone's control. It does not cover a trip that was planned long from the start.

Part 135 also requires the certificate holder to give each flight crewmember at least 13 rest periods of at least 24 consecutive hours each in every calendar quarter, under 135.267(f).

Part 91K: a table instead of a look-back

Fractional programs work from a table in Section 91.1059(c). For normal duty, a crew needs at least 10 hours of rest immediately before duty, a duty period of up to 14 hours, and flight time of up to 8 hours for one pilot or 10 hours for two. After duty, rest is at least 10 hours, or 14 hours after multi-time-zone flights.

The table also has an "extension of flight time" column for unplanned delays. Flight time may then run past 8 hours up to 9 for one pilot, or past 10 hours up to 12 for two pilots. The price is more rest afterward: 12 hours, or 18 hours after multi-time-zone flights.

Section 91.1057 defines an extension of flight time as an increase caused by circumstances beyond the control of the program manager or crew, "such as adverse weather," that "are not known at the time of departure." It also defines a multi-time-zone flight as a time-zone difference of 5 or more hours in one direction within the same duty period, flown between 60 degrees north and 60 degrees south latitude.

What counts as rest and duty

The definitions matter as much as the numbers. Under 135.273, a duty period runs "between reporting for an assignment involving flight time and release from that assignment." A rest period is time "free of all responsibility for work or duty should the occasion arise."

Section 91.1057 is even more explicit for fractional crews: all time between report and release is part of the duty period, "even if flight time is interrupted by nonflight-related duties." Reserve status is neither duty nor rest under that section.

In practice, a day spent waiting at the FBO for a delayed passenger is still duty, and a hotel night where the scheduler keeps calling with trip changes may not count as rest.

Flight attendants have their own rules

Flight attendants assigned under a Part 135 certificate fall under 135.273. In general, a scheduled duty period may not exceed 14 hours and must be followed by at least 9 consecutive hours of scheduled rest. That rest may be reduced to 8 hours only if a later rest of at least 10 consecutive hours begins within 24 hours. Longer duty days of up to 16, 18 or 20 hours require additional flight attendants beyond the minimum complement, and the 20-hour option applies only to trips that land or take off outside the 48 contiguous states and the District of Columbia.

A practical holiday checklist

  • Before accepting a trip, run the 24-hour look-back from the planned arrival of the last leg.
  • Log every commercial hour, including flying for other operators.
  • Count waiting time at the FBO as duty.
  • If weather or a late passenger stretches the day, know the extra rest you will owe before the next assignment.
  • When the manual and the regulation differ, fly to the stricter of the two.
  • Fatigue is not only a legal question. A legal schedule can still leave a crewmember too tired to fly safely, and every pilot remains responsible for deciding whether they are fit for the flight.

The holiday rush will pass. The rules, and the reasons behind them, do not.

Sources

  1. eCFR: 14 CFR 135.267 Flight time limitations and rest requirements: Unscheduled one- and two-pilot crews
  2. eCFR: 14 CFR 135.273 Duty period limitations and rest time requirements
  3. eCFR: 14 CFR 91.1057 Flight, duty and rest time requirements: All crewmembers
  4. eCFR: 14 CFR 91.1059 Flight time limitations and rest requirements: One or two pilot crews